Update from the trenches

IMG_20150906_144044502 IMG_20150906_142214447 IMG_20150906_142209634 IMG_20150906_142206569

 

I had a family move out in relatively quick fashion last week.  I was informed (via phone call) of a musty smell in the house.  That day (a Saturday), I installed a dehumidifier in the basement.  Two days later, I received another call to inform me that a much more significant problem must be present.  I called a local mold mitigation contractor (who immediately informed me they would simply bill my insurance company…scam much?)

The local contractor did actually visit the house, but refused to provide a fixed quote.  They simply said “we’ll let you know how much it will be when we’re finished”.  Unfortunately, I’m not in a position to accept a contract on those terms, so I decided to handle the kitchen remodel myself.

I have a list of ‘must be remodeled at some point’ projects and this kitchen is a part of that list.  The kitchen will be finished by Thanksgiving, hopefully before.  While tearing into the walls, I found original newspaper articles the construction of the house.  Most dated from 1890 and 1891!  Philipsburg had great sarsaparilla, some sort of ‘Indian loans'(?) and an active corset market.

Needless to say, I found very little mold, except a little under the kitchen sink.  I will be fixing the sources of water (leaky pipes) and reinstalling a kitchen.  I’ve decided to go for some San Francisco charm and rather than install $600+ upper cabinets, I will use some black iron pipe:

Black Iron Pipe shelving

Let’s hope the final product looks half as awesome.

1 Thought.

Leave a Reply

Your email address will not be published. Required fields are marked *